My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 2:02:02 AM
Creation date
5/24/2021 4:13:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2959
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C: <br /> FIELD AND SAMPLING METHODS <br /> CA DRILLING <br /> C.1.1 Well Destruction <br /> On August 7 and 8, 2008, Science Applications International Corporation(SAIC) supervised RSI <br /> Drilling (C57 #802334) in the proper destruction of monitoring wells MW-4 and MW-5. The <br /> condition of each well was inspected prior to destruction. The total depth of each well was <br /> measured and compared to the well construction details. Hand-auger borings were advanced in <br /> compliance with SAIC Environmental Health and Safety Procedure 130, "Subsurface Hazard <br /> Avoidance" around the perimeter of each well to 8 feet below ground surface (bgs)to confirm <br /> the absence of utilities or other subsurface obstructions. <br /> The wells were overdrilled using a Geoprobe 6620DT track-mounted drill rig equipped with <br /> 8.75-inch, hollow-stem augers. The boreholes were backfilled with neat cement using a tremie <br /> pipe from total depth to ground surface. A representative of the San Joaquin County <br /> Environment Health Department(SJCEHD)was on-site during a portion of each well destruction <br /> to ensure that proper procedures were utilized. <br /> C.1.2 Soil and Groundwater Investigation <br /> On August 11 to 18, 2008,November 17 to 25, 2008, and March 3 to 5, 2009, SAIC supervised <br /> RSI Drilling in the advancement of 27 soil borings (SB-18 through SB-30 including SB-24B, <br /> and SB-32 through SB-43) at the locations shown on Figure 2. The borings were advanced to <br /> depths ranging from 10 to 88 feet bgs. <br /> In accordance with the approach prescribed in the Technical Approach to Site Evaluation and <br /> Decision Making, Old Valley Pipeline Sites (Geomatrix Consultants, Inc., 2005), and to the <br /> extent practicable, SAIC attempted to collect soil samples from the target depth, or in the event <br /> of contamination, from the most-affected soil interval. The completion of soil borings generally <br /> conformed to SAIC Field Technical Procedure [FTP] No. 525, "Soil Sampling Using an Auger." <br /> All borings (with the exception of SB-31, which was advanced to 10 feet bgs using a hand auger) <br /> were advanced using a Geoprobe 6620DT direct-push drill rig equipped with 2.25 inch- <br /> diameter dual-tube rods along with a continuous coring device used to collect soil samples. <br /> Dual-tube tooling was selected to provide a seal when sampling through saturated soils and to <br /> facilitate the installation of pre-packed well screens as explained in section C.3. <br /> The samples were screened with photo-ionization detection equipment,using procedures <br /> consistent with SAIC FTP No. 750, "Field Measurement Procedures—Organic Vapor <br /> Detection,"to detect the presence of residual petroleum in soil. The soil was logged in general <br /> accordance to the Unified Soil Classification System as presented in American Society for <br /> Testing and Materials (ASTM) 2488-90 under the supervision of a California Professional <br /> Geologist. Other information was entered into field logbooks to document where, when, how, <br /> and from whom any vital project information was obtained,using procedures described in SAIC <br /> FTP No. 1215, "Use of Field Logbooks." <br /> Each open borehole was plugged and abandoned following completion of the soil borings <br /> according to SJCEHD requirements. <br /> C-1 <br /> From screwe to solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.