My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 2:02:02 AM
Creation date
5/24/2021 4:13:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2959
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 March 1997 RADIAN <br /> N T E R N AT I O N A L 1990 N. California Blvd. <br /> Suite 500 <br /> Ms. Katie Hower walnut Creek,CA 94596 <br /> ( <br /> Chevron Pipe Line Company (510)932-7120 <br /> FAX(510)932-7130 <br /> P.O. Box 5059 <br /> San Ramon, CA 94583-0959 <br /> Subject: Submittal of Draft 27 February 1997 Groundwater Sampling at 35275 Welty <br /> Road, Vernalis, California Report <br /> Dear Ms. Hower: <br /> Enclosed please find three copies of the subject report, two bound and one unbound. We have <br /> also submitted one copy of the report to Norm Hunter for delivery on Monday, 24 March 19917. <br /> We will incorporate comments from Norm Hunter as soon as they are received so that the report <br /> can be finalized and delivered to the Central Valley Regional Water Quality Control Board. <br /> j Thank you for the opportunity to support your efforts on this project. I look forward to an <br /> opportunity to work with you again. <br /> ■ Sincerely, <br /> ?Jacqueline C. Shulters, R.G. <br /> Project Manager/Senior Geologist <br /> cc: Dan Lapporte, Radian International <br /> Bob Vandervort, Radian International (w/o enclosure) <br /> i encs. <br /> Ik E <br />
The URL can be used to link to this page
Your browser does not support the video tag.