My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014092
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
2706
>
2600 - Land Use Program
>
PA-2100061
>
SU0014092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:51:56 AM
Creation date
5/25/2021 7:58:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014092
PE
2666
FACILITY_NAME
PA-2100061
STREET_NUMBER
2706
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912013, -11, -14
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
2706 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1822
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by PG&E, and a gas line runs beneath Pock Lane adjacent to the project site. <br /> Telecommunication service is available through existing lines in the area. <br /> The project site is currently within the boundaries of Republic Services, one of five solid <br /> waste collectors providing service under franchise to San Joaquin County. The San <br /> Joaquin County Code requires that solid waste be collected from residential generators a <br /> minimum of once a week, and at least twice a week for commercial and industrial <br /> generators (San Joaquin County 2016a). Solid waste is transported and disposed of <br /> primarily at three active sanitary landfills in San Joaquin County. The North County <br /> Landfill on East Harney Lane has available capacity to 2048, and the Foothill Sanitary <br /> Landfill on North Waverly Road has available capacity to 2082 (CalRecycle 2021). The <br /> Forward Landfill on Austin Road near Stockton was to have reached its capacity in 2020; <br /> however, the County Board of Supervisors recently approved an expansion of Forward <br /> Landfill that would extend its life to 2036 (Crunden 2020). <br /> Environmental Impacts and Mitigation Measures <br /> a) Construction or Relocation of Infrastructure. <br /> Existing water, wastewater, and storm drainage lines are in the vicinity of the project site. <br /> Extensions from the project site to these existing facilities would occur within the <br /> existing County rights-of-way; no undeveloped lands would be affected by the <br /> installation of these extensions. The project would connect to existing electricity, natural <br /> gas, and telecommunication lines in the vicinity with no need for extensions. <br /> Infrastructure serving the proposed lots would be installed on the project site as part of <br /> site development, and therefore would not have impacts distinct from site development. <br /> Project impacts related to the construction or relocation of infrastructure would be less <br /> than significant. <br /> b) Water Supply. <br /> The project would connect to the water supply system of Cal Water. Existing water lines <br /> are in the project vicinity. According to Cal Water's 2020 Urban Water Management <br /> Plan for the Stockton district, Cal Water supplied approximately 24,106 acre-feet of <br /> water to its Stockton District in 2020. The amount of water used per capita per day in <br /> 2020 was approximately 124 gallons (Cal Water 2021). Based on the projected <br /> population of 641 (see Section 3.14, Population and Housing), project water demand at <br /> buildout would be 79,484 gallons per day, or approximately 130 acre-feet per year. <br /> The Cal Water Stockton District obtains approximately 84 percent of its water through <br /> purchases from the Stockton East Water District, with the remainder from 41 <br /> groundwater wells operated by Cal Water, of which 25 are currently active. As discussed <br /> in Section 3.10, Hydrology and Water Quality, the Cal Water 2020 Urban Water <br /> Management Plan for the Stockton District indicates that adequate water supply would be <br /> available to accommodate future demands in its service area, including the project site, <br /> during normal, single dry-year, and multiple dry-year scenarios. This conclusion <br /> considers projected water demands within the Stockton District, based on anticipated <br /> development and population growth (Cal Water 2021). As the project is consistent with <br /> Pock Lane Public Review Draft IS/MND 3-71 May 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.