My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014092
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
2706
>
2600 - Land Use Program
>
PA-2100061
>
SU0014092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:51:56 AM
Creation date
5/25/2021 7:58:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014092
PE
2666
FACILITY_NAME
PA-2100061
STREET_NUMBER
2706
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912013, -11, -14
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
2706 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1822
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 38 Date: 8/13/2021 10:45 AM <br /> Pock Lane Subdivisions- San Joaquin County, Annual <br /> EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied <br /> OffRoad Equipment <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br /> Demolition •Concrete/Industrial Saws 11 8.00' 81' 0.73 <br /> ---------------------------:---------------------------I----------------- -------------F------------------------------------------ <br /> Demolition *Excavators 31 8.00- 158' 0.38 <br /> -------------------- :---------------------------I----------------- -------------F------------------------------------------ <br /> Demolition •Rubber Tired Dozers 2: 8.00' 247' 0.40 <br /> ---------------------------:---------------------------I----------------- -------------F------------------------------------------ <br /> Site Preparation *Rubber Tired Dozers 31 8.00, 247: 0.40 <br /> ----------------------------:---------------------------I----------------- -------------t------------------------------------------ <br /> Site Preparation •Tractors/Loaders/Backhoes 4: 8.00, 97: 0.37 <br /> ----------------------------:---------------------------I----------------- -------------F------------------------------------------ <br /> Grading •Excavators 21 8.00- 158: 0.38 <br /> --------------------- :---------------------------I----------------- -------------F------------------------------------------ <br /> Grading •Graders 11 8.00- 187: 0.41 <br /> ----------------------------:---------------------------I----------------- -------------F------------------------------------------ <br /> Grading •Rubber Tired Dozers 11 8.00, 247: 0.40 <br /> --------------------- :---------------------------I----------------- -------------F------------------------------------------ <br /> Grading •Scrapers 21 8.00, 367: 0.48 <br /> --------------------------------------------------------I----------------- -------------F------------------------------------------ <br /> Grading •Tractors/Loaders/Backhoes 21 8.00, 97: 0.37 <br /> ----------------------------:---------------------------I----------------- -------------F--------------------------- -------------- <br /> Building Construction -Cranes 1 I 7.00, 231: 0.29 <br /> --------------------- :---------------------------I- <br /> ---------------- -------------F------------------------------------------ <br /> Building Construction :Forklifts 3: 8.00, 89: 0.20 <br /> --------------------- :---------------------------I----------------- -------------F--------------------------- -------------- <br /> Building Construction •Generator Sets 11 8.00, 84: 0.74 <br /> ----------------------------:---------------------------I----------------- -------------F------------------------------------------ <br /> Building Construction •Tractors/Loaders/Backhoes 31 7.00, 97' 0.37 <br /> ----------------------------:---------------------------I----------------- -------------F------------------------------------------- <br /> Building Construction *Welders 11 8.00, 46' 0.45 <br /> --------------------------------------------------------I----------------- -------------F------------------------------------------ <br /> Paving -Pavers 2: 8.00, 130' 0.42 <br /> ----------------------------:---------------------------I----------------- -------------F---------------------------11-------------- <br /> Paving :Paving Equipment 2: 8.00, 132' 0.36 <br /> --------------------------------------------------------I----------------- <br /> -------------F--------------------------- -------------- <br /> Paving :Rollers 21 8.00, 80' 0.38 <br /> Architectural Coating •Air Compressors 1 6.00: 78: 0.48 <br /> Trips and VMT <br /> Phase Name Offroad Equipment Worker Trip Vendor Trip Hauling Trip Worker Trip Vendor Trip Hauling Trip Worker Vehicle I Vendor Hauling <br /> Count Number Number Number Length Length Length Class Vehicle Class Vehicle Class <br /> Demolition 0.00 i 0.00, 10.80; 7.30 <br /> ---------------•- -------- <br /> Site Preparation 0.00: 0.00 10.801 7.30' ' <br /> i i <br /> + *--------------------r---------r----------+---- -------------------+ +--------------------r---------- <br /> Grading <br /> --------- <br /> Grading 0.00, 0.00, 10.80, 7.30, <br />
The URL can be used to link to this page
Your browser does not support the video tag.