Laserfiche WebLink
FILL SLOPE <br />CLEAR ZONE --/ <br />SOIL SHALL BE PUSHED OVER EQUIPMENT WIDTH <br />ROCKS AND FLOODED INTO <br />VOIDS. COMPACT AROUND <br />AND OVER EACH WINDROW. <br />STACK BOULDERS END TO END. <br />DO NOT PILE UPON EACH OTHER. <br />10' <br />FILL SLOPE <br />10' MIN STAGGER <br />15' ROWS <br />O O <br />NOT TO SCALE <br />ROCK DISPOSAL DETAIL <br />I STANDARD SPECIFICATIONS FOR GRADING I <br />Page 24 of 26 <br />