Laserfiche WebLink
Work Plan- Site Characterization II Page 9 <br /> Former Karlson Trucking Facility <br /> Project No. 191.2 <br /> December 6, 1999 <br /> 3.0 REPORTING & TIME SCHEDULE <br /> The information gathered during this phase of work will be presented in a <br /> report which will include a description of the field work, results of sample <br /> analyses, and their implications. The report will be prepared and signed by a <br /> registered geologist responsible for the work. <br /> The following summarizes the time schedule for the proposed work: <br /> Date Work to be Performed <br /> Week of Jan 2, 2000 Receive Work Plan Approval/Prepare Well Permits& Schedule Drilling. <br /> Week of Jan 9, 2000 Complete Drilling- Geo-Probe Soil Borings. <br /> Week of Jan 16, 2000 Obtain Soil and Groundwater Data - Write Letter to RWQCB <br /> Describing MW Locations. <br /> Week of Jan 23, 2000 Receive Authorization for Monitoring Well Locations - Schedule <br /> Drilling. <br /> Week of Jan 30, 2000 Complete Drilling Work - Hollow Stemmed Auger Boring. <br /> DevelopSample Wells. <br /> Week of February 6, Complete monitoring well installation report. Evaluate work <br /> 2000 completed to date to determine possible appropriate future work. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />