Laserfiche WebLink
Site Assessment Work Plan Outline - 3 - 3/1/01 <br /> G. 41'ater Level Measurement <br /> Elevation reference point at each monitoring well shall be within 0.01 foot. Ground surface <br /> elevation at each monitoring well shall be within 0.1 foot. Method and time of water level <br /> measurement shall be specified. <br /> IV. QA/QC PROCEDURES <br /> Specify number of field blanks and duplicates. <br /> V. TIME SCHEDULE FOR PROPOSED WORK <br /> The work plan shall include a time schedule for implementation of work. <br />