31 March 2008 <br /> AGE-NC Project No. 98-0500 <br /> Page 2 of 10 <br /> stream. Ground water remediation should be conducted concurrently with SVE to facilitate <br /> remediation of the smear zone and upper water table. <br /> 1.2. SHALLOW GROUND WATER REMEDIATION ALTERNATIVES <br /> As a result of the IAS pilot test,a significant reduction of the shallow dissolved hydrocarbons(total <br /> petroleum hydrocarbons quantified as gasoline TPH-g and volatile organic compounds [VOCs]: <br /> Benzene,toluene,ethylbenzene,and total xylenes[BTEX]and 1,2-dichloroethane[1,2-DCA])near <br /> the former UST dispenser island has been observed and should be anticipated at other locations on <br /> the site. The greatest hydrocarbon and fuel additive impact to the water table occurs in the area of <br /> the former dispenser area and the now is centered within the on-site building, at wells MW-7 and <br /> MW-8. Additional in-situ air sparging wells should be installed near wells MW-7 and MW-8, and <br /> within the building to remediate the impact to the ground water table,the upper most hydrogeologic <br /> unit. The proposed IAS and SVE wells should have the same construction with the current <br /> remediation well network. Additional remediation will likely be required to mitigated the deep <br /> dissolved fuel additive 1,2-DCA at the site; with the submittal of a separate work plan the deep <br /> ground water remediation feasibility will be conducted simultaneously with the enhanced SVE/IAS <br /> remediation. <br /> 1.3. REMEDIATION SCOPE OF WORK <br /> The scope of work includes the installation of additional remediation wells,installation of additional <br /> piping connections/control valves to the remediation wells, operation and maintenance of a soil <br /> vapor extraction system for the treatment of the vadose zone contamination,both hydrocarbons and <br /> additives. <br /> 2.0. SCOPE OF WORK <br /> The proposed scope of work will include the following tasks: <br /> • Pre-field work activities; <br /> • Drilling and Soil sample collection; <br /> • Installation of remediation wells (IAS well and SVE wells); <br /> • Installation of SVE and IAS piping network into the newly installed wells; <br /> • SVE/IAS system start-up period (which includes wells); <br /> Advanced GeoEnvironmental,Inc. <br />