Laserfiche WebLink
31 March 2008 <br /> AGE-NC Project No. 98-0500 <br /> Page 10 of 10 <br /> 3.5.2. Soil Vapor Extraction System Maintenance <br /> The SVE system will be maintained on a weekly basis according to manufacturers recommendations. <br /> After stabilization, routine maintenance would represent the only periods of"down time" for the <br /> unit. One to two times each month (assuming 24-hour operation), the unit will be shut down for <br /> routine maintenance procedures such as lubrication, oil changing, and system adjustments. <br /> Advanced GeoEnvironmental,Inc. <br />