My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 9:58:45 AM
Creation date
5/26/2021 2:41:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE IPOCKEDURE ONLY,FOR STANDARD M00- STEP 3T: DJETEWMIME CMLE LENGTH <br /> ELS,PROCEED TO NEXT PAGE. Run cable along vpper tube a nd aver the top plate on <br /> the float bracket as shown. With the float in the dawn <br /> STET 17: INSTALL SMKIET ADAPTOR ASSY position(as shown in Flgum 3T)align loop in cable wO <br /> Put Cable ttru threads in inlet tube and outthru cable rivet and top hole in floaa bracket Use the rivet as a <br /> port on side of inlet tube. Thread me socket adaptor template to size the loop in the cable and pall cable <br /> assembly finger tight into the inlet tube. Nate. the ca- tight and Crimp fernAe with crimplN tool/pliers onto <br /> ble porton rhe inlet tube must be in Ilrte with the Ikot cable at this location. Tried omm cable with wine cut- <br /> as shown previously is Figure 8A- ter/sdsso3r5, For reference,from the seem where the <br /> upper tube and valve toffy meet to the end of the cable <br /> Socket after trimming will require approximareJy IY of cable. <br /> aadaembrly I _ Cable over float bracket <br /> Cable 1 ;� <br /> port Seam <br /> Figar+elT - <br /> STEP 4T: ATTACH CABLE TO FLOAT BRACWT <br /> Fl ue I T Ensure Cable is over the That bracket. Using the sup- <br /> plied rivet align loop in cable with top hole in float <br /> STIcP 2Tt PASS CABLE TH RU FERRULE hracket and pass rivet thru cable kk)ap and fksac bracket <br /> Pass cable thea ferrule. Loop cattle and then pass cable hole. Using rivet tool for 116r dia marKL eJ attach rivet <br /> back thea fenvJe. Keep ferrule loose until cable length and cable to the float bracket. See last page for list of <br /> is determined in the neat step. Nate: If cable end frays replacement cable Parts. <br /> it nnvq be necessary to trim the cable again to pass thru <br /> ferrule. - _._ Attach rivet to tap hole <br /> -7 <br /> 1/B'mandMl r y y' <br /> avec i r r '--.. <br /> Ferruie <br /> C <br /> Trim STEP ST.E:NSUAE PROPER CABLIE OPERATION <br /> cabk Unthread the sock,er ad <br /> aficr � assembly embly ftflm the inlet <br /> tube and ensure&mt and pappet more(reety when <br /> step 3T Loop��� sork T adaptor assembly is pulled tui. it should only <br /> require 3'to 4'of rnpvernent in order to actuate the <br /> Ffgum 2T float and poppet. Thread socket adaptor assembly fin- <br /> gertlght into inlet tip he after test N_ <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.