My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 9:58:45 AM
Creation date
5/26/2021 2:41:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST IPisMmoms Socket <br /> POPPET&FLOAT MOVEMENT <br /> FOR TESTABLE MODELS ONLY '�``� edapmr <br /> TOOLS NEEVED POR TESTING. <br /> 1. 1/4"Auxe drive exuensiori or 3/8'square dnve or d, , <br /> tertsion with 3A*to 1/4'socket adapter. l <br /> 2. Torque wrench 1114`or 31S"square drive ratchet <br /> wrench. <br /> lr f <br /> 3, Pipe dope. <br /> 4. Flashlight(optional). <br /> Open Poppet closed Poppet <br /> TVST STEP l: <br /> Remove Spill container cDver and All cap from fiat adapt- Tes?Fig�r�e r <br /> er and look down into the tube and make sure n4 debris Pull on a dension a <br /> or frxeignabjects arp pmsent. ifdehris or foteigrt ob- <br /> J"are present take appropriate steps before proceed- socket adaptor <br /> irigl. Look down into the tube and ensure poppet is <br /> compimNy protected by The deCection shield. See Test ""`_�—="J"'+J •-} � <br /> Figure 1. If poppet is exposed and tar*Is rmt Full the - <br /> otie chi I valve should be replaced. A fia;lttight may help <br /> when i nspec ling the tube. i i ice` <br /> TUT STEP 2; j <br /> Unthread the socket adaptor assem*from the inlet � <br /> tube usareq a 1/4`square&Wve extension arA wrerKh. � <br /> The extension will attach to the socket adaptor. Secure - <br /> all tools to ensure they don't fall into the tank or valve- _ <br /> -- <br /> 1Nith the extertslan still attached pull an the socket <br /> a4aptor and cabie assembly and ensure float and pair - -- <br /> mi mare/function properly. It should only re4vtre 3' <br /> 1 n 4'of movement and Im t han S lbs 4f force i n order �- <br /> to actuate the float and poppet. When looking down <br /> into the upper tube ensure poppet is visible and moves <br /> into the flow path isee Test figure 1 &2)when socket Open <br /> adaptor is pukd and resets properly~Locketadap- Poppet Closed <br /> tar i5 releaoed. If poppet does not actuate freely lake poppet <br /> apQrvpriate SWPS t0 Correct, Float moves <br /> I i up <br /> I <br /> T1I`ST STEP 3: <br /> Apply pipe dope to the socket adaptor threads, Piper-- <br /> dope dwuld be a non-hardening gasoYne resistant pipe <br /> thread seal cornpouhd. Make sure poppet and float <br /> have reset properly and are nptvislble then install sock- <br /> et adaptor and torque to 35 ftabs(42 Iri-Abs)minimum <br /> to 5.0!t4bs(60 in-lbs)rna drnum. After instal ling socket <br /> r <br /> adaptor,to ensure vapor tightness,QPW reconwuenYds <br /> conducting pressure testing per CARS TP2C t D. Some Test FkWV 2 <br /> was may require pressure testing of overfill valve per <br /> GARBTP201,1DtoensurevalveIsvapor right. tfthe <br /> drop tube fails pressure testing it may be necessary to <br /> check the seal at tete poppet adaptor threAds. ROnM11 <br /> �'r cap and spill contai"ar<mway air tasting. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.