My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
56
>
2900 - Site Mitigation Program
>
PR0526394
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 11:39:23 AM
Creation date
5/27/2021 10:35:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0526394
PE
2960
FACILITY_ID
FA0017859
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
56
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737003
CURRENT_STATUS
01
SITE_LOCATION
56 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br />2012 TIDEWATER STOCKTON WORK PLAN FOR SEPARATE PHASE HYDROCARBON REMOVAL <br />AT THE WATERFRONT TOWERS PARKING LOT <br />Table of Contents <br />1.0 INTRODUCTION 1 <br />1.1 Site Description 1 <br />1.2 Site and Vicinity Background 1 <br />1.3 Regional and Local Geology/Hydrogeology 2 <br />2.0 RECOMMENDED REMEDIAL ALTERNATIVE 4 <br />3.0 REMEDIAL ACTION IMPLEMENTATION 5 <br />3.1 Remedial Design 5 <br />3.2 Permitting and Access Agreement 6 <br />3.3 Site Health and Safety Plan 6 <br />3.4 Pre-Construction Activities 6 <br />3.5 Construction Activities 7 <br /> <br />3.5.1 Product Removal Remediation System Installation 7 <br /> <br />3.5.2 Waste Profile and Disposal 7 <br />3.6 Periodic Monitoring Reports 7 <br />4.0 OPERATION AND MAINTENANCE 8 <br />4.1 Data Collection 8 <br />4.2 Operation and Maintenance Schedule 8 <br />4.3 Shutdown Criteria 9 <br />5.0 SCHEDULE 10 <br />6.0 LIMITATIONS AND CERTIFICATIONS 11 <br />LIST OF FIGURES <br />Figure 1 <br />SITE PLAN <br />Figure 2 <br /> <br />SITE PLAN WITH PROPOSED REMEDIATION COMPOUND LOCATION <br />LIST OF APPENDICES <br />Appendix A SUMMARY OF PREVIOUS INVESTIGATIONS <br />i
The URL can be used to link to this page
Your browser does not support the video tag.