Laserfiche WebLink
Stantec <br />2012 TIDEWATER STOCKTON WORK PLAN FOR SEPARATE PHASE HYDROCARBON REMOVAL <br />AT THE WATERFRONT TOWERS PARKING LOT <br />Table of Contents <br />1.0 INTRODUCTION 1 <br />1.1 Site Description 1 <br />1.2 Site and Vicinity Background 1 <br />1.3 Regional and Local Geology/Hydrogeology 2 <br />2.0 RECOMMENDED REMEDIAL ALTERNATIVE 4 <br />3.0 REMEDIAL ACTION IMPLEMENTATION 5 <br />3.1 Remedial Design 5 <br />3.2 Permitting and Access Agreement 6 <br />3.3 Site Health and Safety Plan 6 <br />3.4 Pre-Construction Activities 6 <br />3.5 Construction Activities 7 <br /> <br />3.5.1 Product Removal Remediation System Installation 7 <br /> <br />3.5.2 Waste Profile and Disposal 7 <br />3.6 Periodic Monitoring Reports 7 <br />4.0 OPERATION AND MAINTENANCE 8 <br />4.1 Data Collection 8 <br />4.2 Operation and Maintenance Schedule 8 <br />4.3 Shutdown Criteria 9 <br />5.0 SCHEDULE 10 <br />6.0 LIMITATIONS AND CERTIFICATIONS 11 <br />LIST OF FIGURES <br />Figure 1 <br />SITE PLAN <br />Figure 2 <br /> <br />SITE PLAN WITH PROPOSED REMEDIATION COMPOUND LOCATION <br />LIST OF APPENDICES <br />Appendix A SUMMARY OF PREVIOUS INVESTIGATIONS <br />i