Laserfiche WebLink
April 27, 2012 <br />Adrian Perez, P.E. <br />Senior Engineer <br />Stantec <br />2012 TIDEWATER STOCKTON WORK PLAN FOR SEPARATE PHASE HYDROCARBON REMOVAL <br />AT THE WATERFRONT TOWERS PARKING LOT <br />6.0 Limitations and Certifications <br />This work plan was prepared in accordance with the scope of work outlined in Stantec's contract <br />and with generally accepted professional engineering and environmental consulting practices <br />existing at the time this report was prepared and applicable to the location of the Site. It was <br />prepared for the exclusive use of ConocoPhillips Company and Chevron EMC for the express <br />purpose stated above. Any re-use of this report for a different purpose or by others not <br />identified above shall be at the user's sole risk without liability to Stantec. To the extent that this <br />work plan is based on information provided to Stantec by third parties, Stantec may have made <br />efforts to verify this third party information, but Stantec cannot guarantee the completeness or <br />accuracy of this information. The opinions expressed and data collected are based on the <br />conditions of the Site existing at the time. No other warranties, expressed or implied are made <br />by Stantec. <br />Information, conclusions, and recommendations provided by Stantec in this document regarding <br />the site have been prepared under the supervision of and reviewed by the licensed professional <br />whose signature appears below. <br />Licensed Approver: <br />11