My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
56
>
2900 - Site Mitigation Program
>
PR0526394
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 11:39:23 AM
Creation date
5/27/2021 10:35:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0526394
PE
2960
FACILITY_ID
FA0017859
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
56
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737003
CURRENT_STATUS
01
SITE_LOCATION
56 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that were discovered during the December 2003 underground utility search on the Parcel 2A <br />property, and locating pipelines that were anticipated beneath West Weber Avenue and the <br />Waterfront Towers parking lot and beneath former Edison Avenue near the eastern entrance to <br />the Delta View Apartments. The work plan also proposed the installation of horizontal SVE <br />wells to extract petroleum hydrocarbons from soil beneath five apartment buildings to the south, <br />west and northwest of the DPE remedial well field, and connection of those wells to the DPE <br />system. The RWQCB-CVR approved the April 15, 2004 work plan and the June 14, 2004 letter <br />addressing RWQCB-CVR comments to the work plan (Response to RWQCB-CVR Letter Dated <br />May 14, 2004) in electronic correspondence dated June 21, 2004. <br />SECOR completed pipeline abandonment/removal activities during the fourth quarter 2004, and <br />the installation and connection of horizontal SVE wells to the DPE system during the third <br />quarter 2005. Pipelines discovered during the December 2003 investigation, as well as <br />additional pipelines discovered during pipeline abandonment/removal activities, were removed <br />from the undeveloped portion of the L&M OU, soil was excavated to approximately 10 ft bgs, a <br />500-gallon steel UST was removed, and old well was properly abandoned, and pipelines <br />trending off the undeveloped portion of the L&M OU were rinsed and filled with cement. <br />Approximately 300 gallons of product/water mixture were removed from three pipelines and <br />approximately 350 gallons of product was pumped out of the UST. Horizontal SVE wells were <br />installed beneath the bottom of the excavation and the bottom was lined with a high density <br />polyethylene (HDPE) liner. Additionally, six horizontal SVE wells were installed beneath five <br />apartment buildings in the Delta View Apartment complex. Final results and a work plan for <br />additional pipeline removal in the Waterfront Towers parking lot are presented in SECOR's <br />Pipeline Removal, Abandonment, Soil Excavation, On-Site Horizontal SVE Well Installation, and <br />Horizontal SVE Well Installation Beneath Delta View Apartments Report and Work Plan for <br />Pipeline Removal, Abandonment, and Sod Excavation in Waterfront Towers Parking Lot dated <br />February 10, 2005. <br />Additional assessment activities were conducted at the Site in May 2004 to investigate the <br />vertical extent of petroleum hydrocarbons in the vicinity of the Site. SECOR advanced one <br />deep soil boring (SB-7) to a depth of approximately 140 ft bgs in the vicinity of well MW-17, <br />installed shallow off-site well MW-45, and installed deep off-site wells MW-40 through MW-44 <br />and MW-46. Three groundwater samples were collected at 117, 128, and 139 ft bgs using a <br />HydropunchTM sampling device in soil boring SB-7. Results are summarized in SECOR's report <br />entitled Additional Assessment Report and Work Plan for Additional Deep Groundwater Zone <br />Assessment dated July 29, 2004. <br />From March 21 through April 10, 2005, additional assessment activities were conducted at the <br />Site. Seven B-zone groundwater monitoring wells (MW-47 through MW-53), one groundwater <br />monitoring well intended to be a C-zone well (MW-54), and one groundwater monitoring well <br />intended to be a D-zone well (MW-55) were installed, and three Geoprobe soil borings (GP-1 <br />through GP-3) were advanced. Results are summarized in SECOR's report entitled Additional <br />Deep Groundwater Zone Assessment Report, dated May 25, 2005. <br />From July 13 through July 15, 2005, 16 soil vapor points were installed to monitor soil gas <br />concentrations over time and determine radius of influence of the previously installed SVE <br />system. On July 19 and 20, 2005 baseline soil vapor samples were collected from 12 of the <br />16 vapor points. The SVE system was initiated on August 18, 2005 for select wells. The
The URL can be used to link to this page
Your browser does not support the video tag.