Laserfiche WebLink
3.0 GROUNDWATER MONITORING 25 <br />3.1 GROUNDWATER FLOW DIRECTION AND GRADIENT 25 <br />3.2 GROUNDWATER SAMPLING 25 <br />4.0 REPORTING AND REGULATORY INTERACTION 26 <br />5.0 SCHEDULE .27 <br />6.0 GENERAL CONDITIONS 28 <br />7.0 REFERENCES 28 <br />LIST OF ABREVIATIONS <br />HISTORIC GROUNDWATER ELEVATIONS — UNION PACIFIC <br />RAILROAD PROJECT AND ADJACENT AREA <br />HISTORIC GROUNDWATER ELEVATIONS — UNION PACIFIC <br />RAILROAD PROJECT AND ADJACENT AREA- DECEMBER 2004 <br />THROUGH AUGUST 2005 <br />GRID COORDINATES OF PROPOSED SOIL GAS SAMPLING <br />LOCATIONS UNION PACIFIC RAILROAD PROJECT <br />GRID COORDINATES AND SAMPLING DEPTHS OF PROPOSED <br />SOIL SAMPLING LOCATIONS UNION PACIFIC RAILROAD <br />PROJECT <br />SITE MAP AND AERIAL PHOTO <br />HISTORIC GROUNDWATER ELEVATIONS FOR MONITORING <br />WELLS <br />GROUNDWATER ELEVATION CONTOUR MAP <br />FIGURE AND OVERLAY: PROPOSED SOIL GAS SAMPLING <br />LOCATIONS <br />FIGURE AND OVERLAY: PROPOSED SOIL BOREHOLE <br />LOCATIONS <br />MONITORING WELL CONSTRUCTION DIAGRAM <br />UNION PACIFIC RAILROAD PROJECT SCHEDULE <br />TABLES <br />TABLE 1 <br />TABLE 2 <br />TABLE 3 <br />TABLE 4 <br />FIGURES <br />FIGURE 1 <br />FIGURE 2a — 2e <br />FIGURE 3 <br />FIGURE 4 <br />FIGURE 5 <br />FIGURE 6 <br />FIGURE 7 <br />11 <br />Golden State Environmental, Inc. Los Angeles, San Diego and Houston <br />JULY 2006