Laserfiche WebLink
Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />10967 Copperopolis Road. Results are presented in SGI's Off-Site Investigation Report, dated <br />April 30, 2015 (SGI, 2015b). <br />2.3.1 Investigation Activities Completed by Interested Parties <br />A brief summary below details work completed at the Site by interested parties: <br />March 5, 1993 — The two USTs were removed under permit by Janet Wisecarver; <br />October 31, 1995 — Excavation activities performed by UEC were completed under a <br />contract with Stockton Mortgage Company; <br />January 2001 — Property was transferred from Janet Wisecarver to Philip and Irene Henry. <br />August 27, 2001 — Subsurface investigation performed by UEC was completed under a <br />contract with Philip Henry; <br />January 2004 — Property was transferred from Philip and Irene Henry to Carl McArthur, Jr. <br />Investigation work completed since 2011 by DGS has been directed by the CRWQCB <br />under the EAR program Site No. R10-129. <br />2-3 The Source Group, Inc.