Laserfiche WebLink
Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />Following finalization of the design and concurrent with agency permitting, the construction will be <br />bid out to at least three qualified construction contractors. Contractor selection will require <br />approximately one month following receipt of the bids. Following receipt of all necessary permits <br />by the contractor, field work and field inspections for the installation will require approximately one <br />month to complete. Treatment system shakedown/start-up testing will be completed within <br />approximately two weeks after final agency inspections/notifications. O&M and semi-annual <br />reporting will be completed thereafter throughout the remedial process. <br />8-2 The Source Group, Inc.