My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2900 - Site Mitigation Program
>
PR0537118
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 3:19:00 PM
Creation date
5/27/2021 2:48:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0537118
PE
2957
FACILITY_ID
FA0021303
FACILITY_NAME
WATERLOO FOOD & FUEL
STREET_NUMBER
3032
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 WATERLOO RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Sidhu -2- November 5, 2003 <br />The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br />determined if the additional tasks and costs are necessary and reasonable. However, if costs <br />exceed the above pre-approved amounts, the Fund will be unable to expedite your <br />Reimbursement Request. <br />The work products must be acceptable to the County. <br />If a different scope of work becomes necessary, then you must request pre-approval of costs <br />on the new scope of work. <br />Although I have referred to the AGE proposal in my pre-approval above, please be aware <br />that you will be entering into a private contract: the State of California cannot compel you to <br />sign any specific contract. <br />I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br />or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br />work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br />call me. <br />Please remember that it is still necessary to submit the actual costs of the work as explained in <br />the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br />approval before you will be reimbursed. Please insure that your consultant prepares their <br />invoices to include the required breakdown of costs on a time and materials basis, that <br />invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br />provided for any changes made in the scope of work or increases in the costs. When the <br />invoices are submitted you must include copies of all: <br />subcontractor invoices, <br />technical reports, when available, and <br />applicable correspondence from the regulatory agency. <br />Please call if you have any questions; I can be reached at (916) 341-5796. <br />Sincerely, ••••"7 <br />Mark Owens, Water Resources Control Engineer <br />Technical Review Unit <br />Underground Storage Tank Cleanup Fund <br />Enclosure <br />California Environmental Protection Agency <br />%,c1 Recycled Paper
The URL can be used to link to this page
Your browser does not support the video tag.