Laserfiche WebLink
Wellblaster <br /> 9530 Hageman Rd. STE B#349 Bakersfield CA,93312 � <br /> Phone:(916)761-5224 Email:tylor@wellblaster.com <br /> Website:www.wellblaster.com <br /> Date: January 2,2026 BLASTING WORK PLAN Wellblaster <br /> Well:MW5 CMT Location:3032 Waterloo Rd. Plan date and time:Pending <br /> Casing 2-inch ID CMT to 185 feet Stockton,CA <br /> f—Sealing pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 2 inches <br /> Charge Wt. 0.15 Kg 150 grams <br /> 0 Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> Pressure at 10 feet 0.00 29 psi <br /> 40' Explosive Cord <br /> Detonator placed at 45 feet Density g/cc 1.60 g/cc <br /> Detonation Velocity 22,000 ft/s 6,706 m/s <br /> Casing Diameter 2 inches <br /> 60' Grains 25 gr/ft 1.62 g/ft <br /> Detonation pressure 180 k/bar <br /> Total energy pef ft. 11 k/bar <br /> Pressure at casing 3.48 k/bar 52,062 psi <br /> 80, *These are estimated pressure for a empty well <br /> Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> Detonating Cord 4. Pump sealing material to top of well <br /> 100' Start 45 feet 5. Check and clear blast area(sound blast warning) <br /> Intervals Linear 6. Arm explosives <br /> End 185 feet 7. Confirm area clear(final blast warning) <br /> Strength 25 rain 8. Detonate charge <br /> g 9. Check hole and sound all clear <br /> 120' Total 140 feet 10. Refill cement to top of well to form a mushroom cap <br /> Total los Expives <br /> 4los Name of Blaster Preparing Plan: Tylor McMillan <br /> 140' <br /> *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 160' <br /> 180' <br />