My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2900 - Site Mitigation Program
>
PR0537118
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 8:06:23 AM
Creation date
5/27/2021 2:52:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537118
PE
2957 - UST FILE - RWQCB
FACILITY_ID
FA0021303
FACILITY_NAME
WATERLOO FOOD & FUEL
STREET_NUMBER
3032
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3032 WATERLOO RD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wellblaster <br /> 9530 Hageman Rd.STE B#349 Bakersfield CA,93312 <br /> Phone:(916)761-5224 Email:tylor@wellblaster.com ° <br /> Website:www.wellblaster.com <br /> Date: January 2,2026 BLASTING WORK PLAN Wellulaster <br /> Well:MW9 Location:3032 Waterloo Rd. flan date and time:Pending <br /> Casing 2-inch ID PVC to 185 feet Stockton,CA <br /> Boosters <br /> i f—Sealing pipe <br /> G 1 Density g/cc 1.55 glee <br /> i <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> i Casing Diameter 2 inches <br /> ' Charge Wt. 0.15 Kg 150 grams <br /> i <br /> i <br /> 20 ' Detonation pressure 207 k/bar <br /> i <br /> i Total energy ea. 13,997 k/bar <br /> ' Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> i <br /> i Pressure at 10 feet 0.00 29 psi <br /> i <br /> 40' ' <br /> i Explosive Cord <br /> ' Density g/cc 1.60 g/cc <br /> i <br /> i Detonation Velocity 22,000 ft/s 6,706 m/s <br /> ' Casing Diameter 2 inches <br /> i <br /> i Grains 25 gr/ft 1.62 g/ft <br /> 60' i <br /> i <br /> i Detonation pressure 180 k/bar <br /> Total energy pef ft. 11 k/bar <br /> i Pressure at casing 3.48 k/bar 52,062 psi <br /> *These are estimated pressure for a empty well <br /> 80, <br /> Site procedure <br /> i 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> ' 3. Lower charges and drop pipe into the well <br /> 4. Pump sealing material to to of well <br /> � Detonating Cord p g p <br /> 100 ' Start 175 feet 5. Check and clear blast area(sound blast warning) <br /> ' 6. Arm explosives <br /> Intervals Linear End 185 feet 7. Confirm area clear(final blast warning) <br /> ' <br /> i 8. Detonate charge <br /> Strength 25 grain 9. Check hole and sound all clear <br /> ' Total 10 feet 10. Refill cement to top of well to form a mushroom cap <br /> 120' ' <br /> i <br /> i <br /> Total Explosives <br /> ' .035 lbs. Name of Blaster Preparing Plan: Tylor McMillan <br /> 140' <br /> i *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> i any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> f <br /> i <br /> 160' ' <br /> i <br /> i <br /> i <br /> ' i Detonator placed at 175 feet <br /> i <br /> 180' <br />
The URL can be used to link to this page
Your browser does not support the video tag.