Laserfiche WebLink
June 2017 <br />AGE Project No. 95-0184 <br />Page 4 of 7 <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Rene Toth Oversee operations, collect samples <br />FIELD CREW: TASK: <br />AGE Representatives Drill, collect samples, advance boring <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work. <br />7.0. COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used: <br />Hand gripping throat: Out of air; cannot breath <br />Grip partner's wrist or both hands around <br />waist: <br />Leave area immediately <br />Hands on top of head: Need assistance <br />Thumbs up: OK; I am alright; I understand <br />Thumbs down: No; negative <br />8.0. EMERGENCY MEDICAL CARE <br />Dameron Hospital located at 525 West Acacia Street and is approximately 5 minutes <br />from the site. Route to the hospital: From the site, head west on W. Miner Avenue, then <br />turn north onto N. California Street, then turn west onto W. Acacia Street, the hospital is <br />on the right / north side of the street approximately 1/2 mile. A map depicting the route to <br />this facility is attached. <br />Advanced GeoEnvironmental, Inc.