Laserfiche WebLink
GATE <br />EASI TWI-C)R SME5 <br />CONCRETE <br />MW-2 '4# 8CPT-1 <br />MW-1 <br />oss <br />SVE <br />SYSTEM <br />SVE unit replaced by <br />GAG SVE unit on 04 February 2011 <br />1.1\ <br />SCALE <br />20 <br />FEET <br />0 <br />- CPT-2 <br />40 <br />LEGEND <br />mw-i 9 MONITORING WELL LOCATION (35-55') <br />MW-8 MONITORING WELL LOCATION (70-75') <br />vw-i VAPOR EXTRACTION WELL (10-35') <br />B1 • SOIL BORING LOCATION AND DESIGNATION <br />ED-1 o SOIL BORING LOCATION AND DESIGNATION <br />Upgradient Environmental Consulting (UEC) <br />CPT-1 8 CPT LOCATION AND DESIGNATION <br />SOIL VAPOR EXTRACTION SYSTEM PIPING <br />, APPROXIMATE LOCATION OF REMEDIATION SYSTEM ENCLOSURE <br />Advanced <br />GeoEnvironmental, Inc. <br />of Northern California <br />'1)1\ 83 • M -6 <br />cp-r-84, W-5 <br />FORMER <br />UST LOCATION <br />ED-1 <br />VW-2 <br />MW-3 <br />INTERIM REMEDIATION SITE PLAN <br />Former OCAMPO PROPERTY <br />821 SOUTH WILSON WAY <br />STOCKTON, CALIFORNIA <br />PROJECT NO. AGE-NC-02-0926 FILE: OCAMPO-SVE FIGURE: <br />DATE: 20 May 2011 DRAWN BY: MAC 2