Laserfiche WebLink
Plan prepared by: <br />Plan reviewed by: <br />Plan reviewed by: <br />John Lane December 5, 2017 <br />(date) <br />December 5, 2017 <br />Project Manager) (date) <br />Health and Safety Plan <br />December 5, 2017 <br />Page 2 <br />SITE SAFETY SIGNATURE SHEET <br />The following site personnel have read the Health and Safety Procedures attached and are familiar with its <br />provisions: <br />NAME (print) <br />Site Safety Officer <br />Other Site Personnel <br />SIGNATURE DATE <br />(Corporate Safety Officer or Assistant) (date) <br />CONDOR