Laserfiche WebLink
MAR-23-2000 16:16 <br /> <br />" D.O.,INC. P.08 <br />CeatMera system may be requirPd. TI-.e Trip ;e E plume is be; cleaned. up by Triple E right ncw. It is <br />sorneWhatreceding. <br />ComMissioner Eley said Mr. De:nichelis wanted to wait to see this .report. He asked how much discretion <br />does the Commission have on that. <br />Mr. McGrew said the report is for the benefit of Public Health. Regarding the matter of timing, that <br />envirCnmental information will be handled in the Initial Study. If there is a significant effect on the <br />environrr,ent, then it would be handled just like any otlher mitigation measure. The report may generate <br />conditions on the subdivision regarding the type of sewer system or water system. <br />Commissioner 'Clay said Environmental Health will have to have a nitrate loading study. He asked if the <br />Cominission needs to see that repor'. tonight. <br />Mr. McGrew said staff created a grace period to say the report Was needed before the final map instead of <br />before f,ling the application. This is within the Planning Commission's discretion. <br />Cchhissicner Morri said the apprint is not trying to sidestep anything. He is doir.g the soil suitability test, <br />the.nitrateloading, and the surface and su'osullace studies. <br />Mr. McGrew said he is doing to dc ail of that_ He said Mr. Cemicheils oarne in with a subdivision subsequent <br />to the pcintwhert they said the study had to be done pncr to the application. <br />Mr. Huccins said many projects have failed the nitrate loading study. He has denied 12 projects because <br />they could not be mitcated for high water table and nitrate impacts. <br />ComMissioner Solari said EL7vircnrnentel':iezitri could efti say no to this project c...nce the study is done. <br />Mr. Huggins said he could eciremiticaton measures. He has reouired additional tests for this proce,rty. <br />ComrnissicnerStockar said the applicant was not Tying, to hide anythinc. <br />)(... Mr. Huns said Mr. Olmstead has never tied to hide e,-rything. <br />Commissioner Carter said they have az:cr.:ye:: projects that were subsaquenty denied by 1-rviroriments-I <br />PUBLIC RSA-RING OPENED: <br />PROPONENTS: <br />HoWard Steligman (7.:740 Shorsiire Drive.#G, Stockton). reoresenting Mr. Olmstead, said the C-eneral an <br />and 'zoning is consistent with this proposal. The conditions are acceptable, including the =actor, of the <br />typographical er7or in Condion No. 1.f.(1) regarding the minimum canons per minute. However, he <br />requested the Commission delete a phrase in Condition Nc. e.h., which states 'cr as required by the County." <br />The project will provide water through CSA 44. He said this was acceptable to staff. Recarding the noise <br />attahuaddn wail that needs to be oonst7Joted, he said it is his underetandinc that the wall cniy needs to be <br />constuoted. at the time Phase 2 is imoiernent.. <br />Kai Lucma said the wail along the railroad tracks is in 'Phase 2. The wail along MacArthur Drive is <br />1. <br />Mr. Seligman re..-uestz/J that Cord,iticn Nc. 7.a. be revised.' to reflect that the studies must be oe&.:rmed oftr <br />to aporoval of the Final Map. Not =II the studies have been completed,. They will be completed before the <br />- e PC: e -2-S9. <br />PC ,M1NUTES <br />TOTAL P.08