My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
0
>
2900 - Site Mitigation Program
>
PR0541818
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 11:41:05 AM
Creation date
5/28/2021 11:19:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541818
PE
2965
FACILITY_ID
FA0023982
FACILITY_NAME
SJC PUBLIC WORKS UTILITY MAINTENANCE DIVISION
STREET_NUMBER
0
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
24809015
CURRENT_STATUS
01
SITE_LOCATION
LINNE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
omewhtrecT tng. <br />ornmissioner Eley said Mr. nernichetis wanted tin wait to see this report He asked how much discretion <br />(hoes the Commission have on that . <br />Ir. McGrew said the report is for the benefit of Public Heath. Regarding the matter of timing, that <br />r,vironmental information will be handled in the Initial Stud. If there is a significant effect on the <br />nviranment, then it would be handled just like any other mitigation measure. The report may generate <br />ondit'ons on the subdivision regarding the type of sewer system Or water system. <br />, <br />ommissicner Eley said Environmental Health 141 have to have a nitrate loading study. He asked if the <br />mrnission needs to see that report tonight. <br />Ir. rvIcGre,„v said staff created a grace period to say the report was needed before the final map instead of . . . <br />efore filing the application. This is within the Planning Commissiorrsdisoretion. <br />mmissionerMorri said the applicant is not tying to sidestep anything. He is doing the soil suitability test, i <br />tha.nitra loading, and the surfec.e and subsurface stidies. <br />Mr. McGew said he is going to do ail of thaL He said Mr. Demidhelis came in with a subdivision subsequent <br />to the point when they said the study had to be done priorto the appGtion_ <br />Mr. Huodins said many projects have failed the nitrate loading Study. He has deeded 12 projects because <br />they CCIdd not be midoated for high water table and nitrate impacts. <br />CommiszionerSdart said Environmental Hazith could still say noi to this project once the study Es done. <br />: <br />Mr. Hugo', ns said ha could require mitgatio1MiERSUIT.--5. He has required addlder.al tests for tints progerV. <br />0.ommissionerStookkr- said the appgrst'lLres not t, yina to hide anything. <br />K Mr_ Hugoins said Mr. OiC115te2d has never tied to hide anything. <br />CommiSsioner Carter said they have approved projects that were subsequently denied by Environments' <br />Health. <br />PUBLIC HEARING OFENF...a: <br />, <br />eatment stern may be require_d_. The Tripie E plume is being cleaned ,„F.i by Triple E right now. It is <br />JUN-23-2000 09:Al W.D.O..1NC. P. <br />PROPONENTS: <br />Howard ealigrnan (7F.;40 Shoreline Drive, t-G, Stodtort). repre.senting Mr. Olmstead, said the Genera1 Plan <br />and zoning is consistent with this propal. The conclitior-s a4a accer..tatite. including the =n-sclor, of the <br />typographical error in Condidon No. 1.f.(1) rsgare..ing the ,Minimurn gallons per minute. Howver, <br />he <br />requested the Commission delete a phrase in Cor.diticn No. 5.hL which states 'or 25 required by the County.' <br />The project will provide water through CSA 44. He said this Was acceptable to star:. Re.garcl.ing the noise <br />attenuadon wall that needs to be constr_Ected, he said it is his Understanding that the wall only needs to t <br />constructed at the dme Phase 2 is implemented. <br />Kai LuCMa said the wail along the raiiro,ad tracks is in Phase 2 The wall alcnc MacArthur Odve is in Phase <br />1. <br />Mr. Sekman requested. that Condition No. 7.2- be reviser:: to reffer <br />..t that the studies rnt..st be performed pricr <br />to approval of the Final Map. Nct ail the studies hav.s teen cpmpleted_ They will be completed i:efore the <br />PC: E-1.-9 <br />PC MINUTES - 6 -
The URL can be used to link to this page
Your browser does not support the video tag.