Laserfiche WebLink
<br />State Water Resources Controlitoard <br />Division of Clean Water Programs <br />1001 I Street • Sacramento, California 95814 • (916) 341-5796 <br />Mailing Address: P.O. Box 944212 • Sacramento, California • 94244-2120 <br />FAX (916) 341-5806 • Internet Address: http://www.swrcb.ca.goldcwphome/ustcf <br /> <br />Winston H. Hickox <br />Secretaly for <br />Environmental <br />Protection <br /> <br />Gray Davis <br />Governor <br /> <br />June 10, 2002 <br /> <br />Kama Harrigfeld/Herum, Crabtree <br />Connell Motor Truck Co., Inc. <br />2291 March Ln W #B-100 <br />Stockton, CA 95207 <br />PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 14483, <br />SITE ADDRESS: 2211 N WILSON WAY, STOCKTON <br />I have reviewed your request, received on May 20, 2002, for pre-approval of corrective action <br />costs. I have included a copy of the "Cost Pre-Approval Request" form; please use this form in <br />the future for requesting pre-approval of corrective action costs. <br />With the following provisions, the total cost pre-approved as eligible for reimbursement for <br />completing the work associated with the cost estimate by Foothill Engineering (FE), is $16,868. <br />The costs associated with conducting a sensitive receptor survey and installing 2 groundwater <br />monitoring wells are pre-approved for the amount shown above (see the table below for a <br />breakdown of costs). <br />COST PRE-APPROVAL BREAKDOWN <br /># Task Amount Pre-Approved Comments <br />1 Receptor Survey 1,900 <br />2 Install 2 monitoring wells 14,967.50 <br />Includes all related costs, drilling, <br />lab, etc. <br />TOTAL PRE-APPROVED $ 16,868 <br />Be aware that this pre-approval does not constitute a decision on reimbursement: necessary (as <br />determined by the Fund) corrective action costs for action work directed and approved by the <br />San Joaquin County Environmental Health Dept (County) will be eligible for reimbursement <br />at costs consistent with those pre-approved in this letter. However, depending on what happens <br />in the field, some costs may not actually be necessary. If the Fund agrees that they were in fact <br />necessary, the Fund will reimburse at reasonable rates (rates consistent with those pre-approved). <br />In order for future costs for corrective action to be part of the expedited reimbursement <br />process, they must be pre-approved in writing by Fund staff <br />All costs for corrective action must meet the requirements of Article 11, Chapter 16, <br />Underground Storage Tank Regulations in order to be eligible for reimbursement. <br />California En viroameatal Protection Agency <br />"D c, Recycled Paper