Laserfiche WebLink
.2 <br />Sheldon Heckman -3- September 8, 1999 <br />Please remember that it is still necessary to submit the actual costs of the work as explained in <br />the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br />approval before you will be reimbursed. Please insure that your consultant prepares their <br />invoices to include the required break down of costs on a time and materials basis, that <br />invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br />provided for any changes made in the scope of work or increases in the costs. When the <br />invoices are submitted you must include copies of all: <br />subcontractor invoices, <br />technical reports, when available, and <br />applicable correspondence from the County. <br />Please call if you have any questions; I can be reached at (916) 227-4518. <br />Sincerely, <br />Wennilyn Fua, Water Resources Control Engineer <br />Technical Review Unit <br />Underground Storage Tank Cleanup Fund <br />Enclosure <br />cc: Ms. Margaret Lagorio <br />San Joaquin County EHD <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />California Environmental Protection Agency <br />aD Recycled Paper