My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
0
>
2900 - Site Mitigation Program
>
PR0545885
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 1:54:57 PM
Creation date
5/28/2021 1:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545885
PE
2960
FACILITY_ID
FA0025954
FACILITY_NAME
SPPL/ARCADY OIL CO
STREET_NUMBER
0
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
02
SITE_LOCATION
0 WHISKEY SLOUGH RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maps may be constructed which will show the distribution of hydrocarbons <br />and organic lead. By using these maps remedial actions can be assessed. <br />5.5 Task 5 - Remedial Action Alternatives Analysis <br />The general results of preliminary site observations and the visual <br />and chemical analyses of soil and groundwater samples will be reviewed to <br />establish recommendations for remediation. In particular, the design and <br />location of any trenches required for product recovery and containment of <br />product migration will be finalized. The need for other measures such as <br />installation of impermeable slurry walls sr a. series of pumping wells to <br />control movement of groundwater containing dissolved fuel constituents will <br />also be evaluated. <br />Remedial activities will be developed in close cooperation with SPPL <br />and the various state regulatory agencies and will be consistent with the <br />findings of the site investigation, the remedial action objectives, and <br />public health and environmental concerns. <br />5.6 Task 6 - Report Preparation <br />It is the goal of this project that the data base for the site will be <br />sufficient to produce engineering design analysis and specifications for <br />the selected long range remedial action. A final report will be issued at <br />the conclusion of the project which will summarize the field and analytical <br />data, interpretations of the data and designs for any proposed remedial <br />action. <br />5.7 Schedule <br />A tentative schedule for implementation of the work plan is presented <br />in Drawing 8. <br />5-5 <br />I1M
The URL can be used to link to this page
Your browser does not support the video tag.