My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
0
>
2900 - Site Mitigation Program
>
PR0545885
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 1:54:57 PM
Creation date
5/28/2021 1:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545885
PE
2960
FACILITY_ID
FA0025954
FACILITY_NAME
SPPL/ARCADY OIL CO
STREET_NUMBER
0
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
02
SITE_LOCATION
0 WHISKEY SLOUGH RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assemble an end cap, tail pipe, screen and blank sections as the <br />well casing/screen is lowered in the hollow-stem; <br />Tremie the sand filter around the casing while removing the augers; <br />Check sand level with weighted tape measure; <br />Place bentonite pellets by calculated volume and re-check pellet <br />level with weighted tape measure; <br />Wait at least 30 minutes for the bentonite pellets to start <br />expanding; <br />Tremie concrete/bentonite seal while removing the hollow-"stem auger <br />to within a few feet of the ground surface; <br />Remove the last auger flight; <br />Cut well casing (with removable swab in place to prevent PVC saw <br />filings from entering the well); <br />Set surface protective casing, cement in place and finish concrete <br />apron; <br />Drill and install traffic barriers. <br />The Shallow monitoring wells will be installed in accordance with the <br />specifications shown on Drawing A.1. Every attempt will be made to locate all <br />wells away from traffic areas. All riser casings will extend at least 2 feet <br />above the ground surface. In areas where there is a considerable amount of <br />vehicular traffic, monitoring wells will be completed entirely below grade and <br />protected with a "Christie" box. <br />A.2.2 Well Development <br />Once the grout seal ,has set for a minimum of 72 hours but no longer than <br />96 hours, the wells will be developed using air surging techniques. A special
The URL can be used to link to this page
Your browser does not support the video tag.