Laserfiche WebLink
c .„ <br />14t CCC.: • <br />Inspection Report 12 August 2005 <br />Windmill Cove Marina <br />San Joaquin County <br />SUMMARY: <br />San Joaquin County has been delegated the regulatory authority for onsite systems provided it follows the <br />Regional Water Board's adopted guidelines. It appears that the county may have approved this system prior to <br />the Regional Water Board adopting the guidelines for onsite systems in 1972. This system does not meet the <br />guidelines for construction set backs from groundwater and surrounding water bodies. A mitigation to the lack <br />of separation from water bodies could be level of treatment and/or new construction. <br />ATTACHMENTS: <br />Attachment A — Facility Map <br />Attachment B — Inspection photo log <br />GEORGE LOCKWOOD, PE <br />Water Resources Control Engineer <br />NPDES Unit <br />Delta Watershed <br />Approved: