Laserfiche WebLink
e4' S /311 <br />Mie <br />Reporting <br />A report will be prepared providing a description of the methods used, summary of laboratory <br />results and opinion on the subsurface conditions of the property. <br />Proposed Work Schedule <br />Schedule: Pre-drilling activity/Permits/Scheduling <br />Drilling/Sampling activity <br />Laboratory Analysis <br />Final report <br />5-10 Days <br />1 Day <br />Soil & Soil Vapor Samples <br />(5 Business Days) <br />2 days after lab analysis <br />report <br />Closing <br />FR appreciates the opportunity to provide this service. Should you have any questions, <br />please feel free to contact us at 800-385-7105. <br />Sincerely <br />John Winkler, PG <br /> Don Kellar, M.S., REP, PG <br />Senior Geologist Principal <br />18-22 East I Ph Street, Tracy California <br />Site Assessment Work Plan <br />6 rif irt Fulcrum Resources Environmental