My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
54
>
2900 - Site Mitigation Program
>
PR0542041
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 12:42:49 PM
Creation date
6/1/2021 12:38:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542041
PE
2950
FACILITY_ID
FA0024136
FACILITY_NAME
A-1 SAW AND MOTOR INC
STREET_NUMBER
54
Direction
N
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
54 N CLUFF AVE
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Partner Site-Specific Health and Safety Plan <br />Introduction <br />Partner Engineering and Science, Inc. (Partner) has been retained by A-1 Saw and Motor Inc. to conduct a Phase II <br />Subsurface Investigation at the subject property. This Health and Safety Plan (HASP) document identifies the <br />Health and Safety procedures that are intended to guide the field activities at the site. The details of this plan apply <br />to employees of Partner and its subcontractors. Regulatory agencies are expected to observe the safety rules and <br />regulations established by their respective organizations in addition to the requirements of this document. <br />This plan must be reviewed and acknowledged by all personnel prior to entering the exclusion zone. In general, a <br />"Tailgate Safety Meeting" is conducted at the initiation of on-site activities and at the beginning of each day <br />thereafter until the completion of the project. However, the actual briefing may be conducted off-site (e.g., in the <br />office) if conditions preclude or render impractical its completion on-site. <br />This HASP will be a living document in that it will be continually updated and/or revised as the site conditions and <br />knowledge of the operations develop further. The development and preparation of the HASP has been based on past <br />experiences and site specific information at the time of preparation. If actual site conditions or operations vary from <br />the data used to prepare this HASP, amendments shall be made to reflect those changes. <br />This HASP has been developed with consideration to current safety standards, health effects, and standards for <br />known contaminants and procedures designed to account for potential hazards from known and/or suspected <br />substances. In preparing this document, Partner has specifically reviewed Occupational Safety & Health <br />Administration (OSHA) Title 29 Code of Federal Regulations (CFR) 1910 & 1926, California Occupational Safety <br />& Health Administration (Cal/OSHA) Title 8 California Code of Regulations (CCR) 5192, the National Institute of <br />Occupational Safety & Health (NIOSH)/OSHA/United States Coast Guard (USCG)/Environmental Protection <br />Agency (EPA) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH <br />Pocket Guide to Chemical Hazards, and the American Conference of Governmental Industrial Hygienists, Inc. <br />(ACGIH) Threshold Limit Values for Chemical Substances and Chemical Agents. <br />Project Information <br />Project Type: <br />Site Name: <br />Address: <br />Partner Project Number: <br />Project Scope of Work <br />Phase II Subsurface Investigation <br />54 North Cluff Avenue <br />Lodi, California 95240 <br />16-169839.2 <br />Advance six borings to 15 feet bgs in the interior/exterior of the subject property (A-1 Saw and Motor Inc.) and <br />collect 24 soil samples for laboratory analysis. <br />Utility Clearance <br />Have necessary underground utility notifications for subsurface work been made? [E] Yes E Not Applicable <br />Partner Site-Specific Health and Safety Plan Page 1 <br />Version 1.02 June 28, 2017
The URL can be used to link to this page
Your browser does not support the video tag.