Laserfiche WebLink
a : I <br />2. Disbursement of funds for corrective action shall be in accordance with a corrective action <br />plan as approved by the Regional Water Quality Control Board (RWQCB), <br />3. If the CIWMB determines that The County of San Joaquin has failed, or is failing, to <br />perform corrective action as required by law, then the CIWMB may direct the County of <br />San Joaquin Auditor -Controller to pay to the Director of Public Works from the pledged <br />revenues sufficient funds to ensure corrective action, 'who then shall be obligated to use <br />such funds for corrective action in accordance with the directives of the CIWMB. <br />4. The Director of Public Works is directed to produce an annual report for transmittal to the <br />CIWMB containing, as appropriate, a revised known or reasonable foreseeable release <br />corrective action cost estimate, prepared as specified in Section 20380 of the Title 27, <br />California Code of Regulations concerning the County -owned landfills. <br />in M039=4 <br />I Rol <br />LE��-MT <br />ABSENT: one <br />ATTEST: LOIS M. SAHYOUN <br />Clerk of the Board of Supervisors <br />o the County of San Joaquin, <br />State of California <br />Deputy Cle <br />SW -8427-R5 <br />by the following vote of the <br />KEN VOGEL, Chai a <br />of the Board of Supervisors <br />County of San Joaquin, <br />State of California <br />