Laserfiche WebLink
1' ' MlZ <br />This work plan presents the procedures for the installation polyethylene <br />tubes within existing PVC pipes located inside the perimeter soil gas <br />monitoring wells (SGW) at Foothill (FHSL), North County Recycling Center <br />And Sanitary Landfill (NCRCSL), Harney Lane Landfill (HLSL) and Corral <br />Hollow Sanitary Landfill (CHSL). Work to be done will be conducted by <br />staff of the Department of Public Works — Solid Waste Division of the <br />(SWD). <br />B . 0 <br />A. FOOTHILL SANITARY LANDFILL <br />FHSL is located in eastern San Joaquin County at 6484 N. Waverly Road, <br />four miles east of Linden, CA. The landfill is a single Class III Waste <br />Management Unit on an 800 -acre parcel. This Unit is comprised of Module <br />"I", Module 1, and future modules. Future modules will overlap onto other <br />completed modules, including Module "I" until final closure of the Unit. <br />Waste discharged to the landfill includes commercial and household waste, <br />construction/ demolition waste, and agricultural waste. <br />B. NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL <br />NCRCSL is located at 17720 East Harney Lane, approximately nine miles <br />east of Lodi. It is a single solid waste management unit, designated Class <br />III, accepting non -hazardous municipal solid waste and inert waste. The <br />site is 185 acres in area, comprised of lined modules, each constructed on <br />an as -needed basis. The landfill is expected to close in 2032, based on <br />current disposal rates and current permitted capacity. <br />C. HARNEY LANE LANDFILL <br />HLSL is a single, closed, unlined Class III landfill located at 14750 <br />E. Harney Lane in Lodi, California. The landfill covers approximately 127 <br />acres, which consists of one 97 -acre primary site and a 15 -acre secondary <br />site. The remaining property area is comprised of access roads, storm <br />water retention ponds, setbacks for environmental monitoring, and <br />firebreaks. HLSL was closed in 1996 and now is under postclosure <br />maintenance. <br />Work Plan- Groundwater Monitoring Well Installation San Joaquin County <br />March 28, 2012 Department Of Public Works <br />1 Solid Waste Division <br />