My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 2:23:38 PM
Creation date
6/1/2021 2:36:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012-2014
RECORD_ID
PR0440007
PE
4434 - LANDFILL DISPOSAL SITE - POST CLOSURE
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
Active, billable
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
14750 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/" diameter O.D. PVC pipes; at HLSL and CHSL, the PVC pipes are Y2" <br />diameter O.D. Also at FHSL and NCRCSL, there are also several older <br />style soil gas wells that have perforated tubes installed within the PVC pipe. <br />For these older style wells, the only work to be done involves installation of <br />a labcock valve inplace of the as built plastic cap. <br />SWD will schedule installation of the GW monitoring wells after approval of <br />work plan. SWD anticipitates to begin the tube installation project by <br />beginning of April 2012. The project may involve eight (8) working days <br />with a work schedule of Monday to Friday 9:00 am to 4.00 pm. <br />County staff will be conducting all work done during this project. The staff <br />involved is familiar with and follows county safety practices. <br />The installation of the new PE tubes within existing PVC pipes inside of the <br />SG monitoring wells does not include excavation of refuse or contact with <br />refuse. <br />A safety meeting will be held on the first day of the project to discuss all <br />safety issues. The following safety practices will be followed during the <br />project. <br />Hard hats, safety glasses and safety vests will be required for personnel <br />who are working near the construction area and operating heavy <br />equipment. <br />Work Plan- Groundwater Monitoring Well Installation San Joaquin County <br />March 28, 2012 Department Of Public Works <br />3 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.