Laserfiche WebLink
Page 1 of 1 <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Tuesday, June 19, 2012 2:14 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Jaime Perez <br />Subject: Harney lane Landfill—Flare St Blower And Piping Replacement <br />Attachments: Bid 6759 As Advertised Cost DWGS .pdf <br />Hello Natalia <br />For your information, our Contractor JR Filanc will be replacing the old blowers and modifying <br />the flare station LFG piping at Harney Lane Landfill's flare station. Attached, please find the <br />project's construction drawings. The tentative work schedule of the project is from June 21st to <br />July 25th, 2012. During the project, the flare will be shutdown to connect the new blower and <br />piping. The Contractor has been allowed only 12 hours of flare shutdown time to do all <br />necessary work for this project. The San Joaquin County Air Pollution Control District will be <br />notified regarding the flare down time. LFG migration during the flare down time is expected to <br />be very minimal. The flare will be restarted as soon as the work is completed within the <br />allowed shutdown time frame. <br />If you have any questions or need any additional information regarding this project, please call <br />or email me at my contact information below. <br />Thanks <br />JOYESH CHANDRA <br />SAN JOAQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Email:jchandra@sjgov.org <br />6/25/2012 <br />