My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 2:23:38 PM
Creation date
6/1/2021 2:36:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012-2014
RECORD_ID
PR0440007
PE
4434 - LANDFILL DISPOSAL SITE - POST CLOSURE
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
Active, billable
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
14750 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PqU l ly <br />THOMAS M. GAU <br />�. DIRECTOR <br />FRITZ BUCHMAN <br />DEPUTY DIRECTOR <br />MICHAEL SELLING <br />DEPUTY DIRECTOR <br />ROGER JANES <br />BUSINESS ADMINISTRATOR <br />Working for YOU <br />October 15, 2012 <br />Mr. Robert McClellon, Program Coordinator <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205 <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.sjgov.org/pubworks <br />ENVIRONMENTAL HEALTH <br />PERMrr/SERV►r;ES <br />SUBJECT: WINTERIZATION PLAN FOR 2012-2013, HARNEY LANE SANITARY LANDFILL <br />Dear Mr. McClellon: Grp, <br />Please consider this submittal of the Winterization Plan for the Harney Lane Sanitary Landfill <br />addressing the winter of 2012-2013. <br />Winterization items that are currently being installed and improved include: <br />1. Filling, grading, and re -vegetation (with fertilizer, grass seed and erosion control matting) <br />of approximately three (3) acres in several areas of the landfill (Figures attached). Filling <br />and re -grading is complete. <br />2. Removing weeds from trench and re -grading the low spots in the drainage ditch along <br />the northwest corner and northeast corner of the secondary site. <br />3. Resurfacing the damaged areas of the central access road. Adding Class II Ag Base <br />and tar/oiling access road. This task has been completed. <br />4. Other improvements which may become apparent. <br />If you have any questions, please contact me at 468-8504. <br />Sincerely, / �J <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:kb <br />N:\1 Harney Lane\Winterization\2012-2013\RMcClellon01-111-winterization.doc <br />Attachments <br />LA 11103C <br />
The URL can be used to link to this page
Your browser does not support the video tag.