Laserfiche WebLink
PqU l ly <br />THOMAS M. GAU <br />�. DIRECTOR <br />FRITZ BUCHMAN <br />DEPUTY DIRECTOR <br />MICHAEL SELLING <br />DEPUTY DIRECTOR <br />ROGER JANES <br />BUSINESS ADMINISTRATOR <br />Working for YOU <br />October 15, 2012 <br />Mr. Robert McClellon, Program Coordinator <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205 <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.sjgov.org/pubworks <br />ENVIRONMENTAL HEALTH <br />PERMrr/SERV►r;ES <br />SUBJECT: WINTERIZATION PLAN FOR 2012-2013, HARNEY LANE SANITARY LANDFILL <br />Dear Mr. McClellon: Grp, <br />Please consider this submittal of the Winterization Plan for the Harney Lane Sanitary Landfill <br />addressing the winter of 2012-2013. <br />Winterization items that are currently being installed and improved include: <br />1. Filling, grading, and re -vegetation (with fertilizer, grass seed and erosion control matting) <br />of approximately three (3) acres in several areas of the landfill (Figures attached). Filling <br />and re -grading is complete. <br />2. Removing weeds from trench and re -grading the low spots in the drainage ditch along <br />the northwest corner and northeast corner of the secondary site. <br />3. Resurfacing the damaged areas of the central access road. Adding Class II Ag Base <br />and tar/oiling access road. This task has been completed. <br />4. Other improvements which may become apparent. <br />If you have any questions, please contact me at 468-8504. <br />Sincerely, / �J <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:kb <br />N:\1 Harney Lane\Winterization\2012-2013\RMcClellon01-111-winterization.doc <br />Attachments <br />LA 11103C <br />