Laserfiche WebLink
i <br /> I <br /> (Continued) <br /> F5.Wastowator Strength (estimates—Enter the average annual and maximum wastewaterstrancgth For this building for each <br /> of the following elemonta of wastewater strength for the period covered by the Permit. <br /> ANY SIGNIFICANT DEVIATION FROM THESE VALUES CAN RESULT IN TERMINATION OF THE PERMIT. <br /> ELEMEN'T'S OF WASTEWATER STRENGTH UNIT CODE MAX DAILY 7 DAY AVG 34 DAY AVG <br /> Suspended Solids mail TSS C <br /> Total Chemical Oxygen Demand m /I COOT 0 <br /> t;illared Chemical Ox en Demand - m fl CODF 0 �� I <br /> 011 and Grease - mall O&GT_ <br /> Chlorine Doniand See Instructions mfafl CL213 a - <br /> Biochemical Gx on Demand _ m ll BOD 0 <br /> Total C7rc anlc Carbvn mall TOC 0 _ <br /> Total Disolved Solids mall TDS <br /> If data from a commercial laboratory was used to determine the values,please give the name and address of the laboratory. <br /> i <br /> Name - Address B <br /> i <br /> FB. Pollution Abatement Practices <br /> a. Wastewator Pretreatment-Check the type of treatment, if any,given wastewater from this building sower before It Is i <br /> discharged to the community sewer: ' <br /> Qnone ®holding tank ❑grease trap Doll&water separator ❑grinding <br /> ({sedlmontation OpH Adjustment ❑biological treatment [lchlorinatlon ❑other <br /> Description: <br /> Describe tho loading rates,design capacity,physical size,etc,of each pretreatment facility checked above. <br /> C K <br /> TWE 0 F ° a mSE WATE�L. 6 b$scat A d2:tul 0-TO 7' f C' <br /> b. Planning Wastewater Pretreatmont Improvements-Describe any changes In treatment or dispoeal methods plan nod or <br /> under construction for the wastewater carried by this building sewer. <br /> F7. Stotni"ter Area <br /> Total Area in squaro feet exposed to storm water and draining to this building sewer: <br /> _ Square feet <br /> G:�dVIUMprM--Staff tEnvlranizaental GonlralWormMFarnl Wastewater Parmit Appllcatlon A-Rdac <br /> i <br />