My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
2900 - Site Mitigation Program
>
PR0542201
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 4:35:41 PM
Creation date
6/1/2021 4:13:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542201
PE
2960
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
01
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. Quality Control/Quality Assurance Plan <br />11.0 SOIL SAMPLING PROTOCOL <br />11.1 Sample Collection During Drilling Activities <br />A proposal will be submitted to the lead Regulatory Authority with proposed boring/sampling <br />locations. The exact location and number of borings at each site will be determined in the field by <br />the Project Geologist/Engineer. <br />Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all sample <br />equipment will be cleaned. Cleaning will be conducted on-site on all sampling equipment between <br />each sample interval. <br />Soil samples will be obtained using a California modified split-spoon sampler containing three, six <br />inch long, two inch diameter brass tubes. The sampler will be driven 18 inches ahead of the hollow <br />stem auger by a 140 pound hammer with a 30 inch drop in accordance with American Society for <br />Testing and Materials (ASTM) Methods D 1586-84 for split barrel sampling of soil and D 1587-83 <br />for thin-walled tube sampling of soils. The blows required to drive the sampler each six inch <br />interval will be recorded on the boring log. The sampler will be removed from the boring and <br />opened to reveal the brass tubes. One tube will be sealed with Teflon tape and plastic end caps, <br />taped and labeled with the following information: data, time, project ID, sample ID, name of <br />sampler and type of analysis. This sample will be immediately placed into a cooler containing dry <br />ice or frozen chemical. A "high-low" temperature recording thermometer will accompany sample <br />shipments to ensure proper temperature maintenance. The samples will be delivered to a state <br />certified laboratory following under chain of custody protocol within 48 hours of sampling, <br />whenever possible. <br />Soil in the tubes will be described according to ASTM standard practice for description and <br />identification of soils (ASTM D-2488-84). Stratigraphic, genetic and other data/interpretations will <br />also be recorded. Soil properties may also be determined from the sampler shoe. These field <br />observations will be noted on a log prepared for each boring/well. <br />During sampling, latex gloves will be worn to prevent cross-contamination with other samples. <br />The disposable gloves will be discarded after collecting samples from each 18-inch sample drive. <br />Soil samples will be collected at five foot intervals, at significant changes in lithology and intervals <br />of obvious contamination in order to develop a complete profile of soil contamination. <br />11.2 Sample Collection During Tank Removal or Excavation <br />Soil samples will collected as soon as possible after removal of the tank. Where feasible, all <br />preparations for soil sampling will be made prior to tank removal. Soil samples collected from a <br />backhoe bucket or directly from the excavation floor will be collected in a thin-walled stainless <br />steel or brass cylinder at least three inches long by one inch in diameter. From 3 to 24 inches of soil <br />will be removed from the immediate surface area where the sample is to be taken and the cylinder <br />then pounded into the soil with a wooden mallet, bulk density driver, or other decontaminated <br />driving device. No head space will be present in the cylinder once the sample is collected. Care <br />will be taken to avoid contamination of both the inside and outside of the cylinder as well as its <br />G:\Data\GROUNDZEGOEMAN ACAMPO \REPORTS \QAQC.doe <br />6
The URL can be used to link to this page
Your browser does not support the video tag.