Laserfiche WebLink
Trans. Grout Seal <br />Seal <br />Sand Pack <br />On file SJC PHS/ EHD <br />#3 sand 13-35 -r-ri-1 <br />#3 sand 13-35' 1-F=T3 0-I I' <br />#3 sand-T3:33 117.13 I -n #3-iard-8-30' <br />#2712 sand 13=33' 12-1 -12' <br />#2/I2 sandT3-35' uTT3' I 1 <br />0-6' <br />Well No. Dia./TD Screen <br />2"/38'MWTj <br />--MW=2 *2737 <br /> <br />MVT-73 *2"/34'I <br /> <br />—1G1W7-4 2"/33' <br />—IGIV7=3-2"735T <br />2"/35' <br />MW7-2'730' <br />— -WV:8 — —T735' <br />2"/33' <br />15-33' 1-0-020" <br />l5-3574 0020" <br />15-33' 0 020" <br />Slot <br />0 020" <br /> <br />15-35' 00211" <br /> <br />15-35' 0-020" <br />2"/30' 10-30' 0 020" #3 sand-8=31r- <br /> <br />15IW:T09— 75=80-' —T10213" #3 sand 73=80' 68=73 V As weasurec on May 15, 2001 <br />Georcipcar TecAnics Inc <br />Soil & Groundwatet Investigation Report <br />J M Equipment <br />Project No 507 2 <br />July 5, 2001 <br />Page 4 <br />2.2 Monitoring Well Installation <br />To investigate the lateral definition of gasoline range petroleum hydiocarbons in the <br />groundwater at this site, GTI installed two water table monitoring wells One well was <br />placed to the northwest (MW-10) and one was placed southwest (MW-7) of the former UST <br />(Figure 2, Site Map) A deep well, MW-109, was placed in the location of the former UST <br />to define the vertical extent of the groundwater plume The new wells and existing wells <br />construction details are illustrated below <br />The monitoring wells were constructed using 2 0-inch chametei PVC casing with flush <br />threads The screened intervals extended from the water table to twenty feet below the <br />water table Groundwater was encountered at approximately 13 5 feet bgs A #3 sand filter <br />pack sunounded and extended two feet above the 0 020 inch screened interval and was <br />topped by a two foot bentonite chip transition seal installed on top of the filter pack and <br />hydrated A surface seal was achieved by pouring a neat cement grout on top of the <br />transition seal The wells were secured with locking watertight caps encased in flush <br />mounted traffic rated well boxes <br />On May 29, 2001, Don Light of Del Tech mobilized to the site to develop the new <br />monitoring wells (using mechanical surging and pumping methods) until a deal stream of <br />water was obtained All development and purge water was containerized in 55-gallon DOT <br />approved containers and stored on site until its disposition can be arranged <br />The-results of the groundwater analyses will be presented in a quarterly monitonng report <br />for the rd Quarter, 2001 (June) event <br />3.0 RESULTS OF INVESTIGATION <br />The geology as it relates to the analytical data is discussed in the conclusion section below <br />Table I in Appendix A contains a full summary of the soil analytical data and the laboratory <br />data sheets are included in Appendix C Appendix D contains the geophysical parameter <br />analytical results A site map with soil boring and monitoring well locations is included as <br />Figure 2