My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
531
>
2900 - Site Mitigation Program
>
PR0542261
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 4:54:22 PM
Creation date
6/1/2021 4:20:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542261
PE
2960
FACILITY_ID
FA0024265
FACILITY_NAME
CENTRAL PLUME/MID PLUME PCE/TCE EXTRACTION WELL
STREET_NUMBER
531
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
531 S CHURCH ST
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE STIPULATIONS AND REQUIREMENTS THAT MUST BE FOLLOWED AT ALL TIMES <br />DRIVEWAY ACCESS SHALL REMAIN OPEN OR ACCESSIBLE AT ALL TIMES <br />All lane closures shall meet or exceed CA MUTCD 2014 specifications as well as conform to hours of work set <br />forth by the City. <br />All areas of work when encroaching upon sidewalk access OR pedestrian safety shall have the latest CA MUTCD 2014 Edition, <br />Temporary Traffic Control, sidewalk closure detour detail in place to ensure pedestrian and public safety. <br />Pedestrian traffic shall at all time have a minimum 4 feet wide area of travel. <br />All open excavation areas shall be backfilled or trench plated prior to public usage. <br />All closures set forth in this TCP are the minimum allowed on project, field conditions may change requiring further traffic safety <br />devices or traffic control person to ensure safety of traveling public, pedestrians as well as work forces. <br />All changes to ensure safety will be made immediately to ensure a safe environment for all parties. <br />All traffic control devices, vehicles and personnel must be suited for the purpose intended as well as meet or exceed latest CA MUTCD <br />2014 Edition, Temporary Traffic Control requirements as well as City requirements. <br />All Devices shall be removed when no longer required. <br />All flaggers shall be certified and all intersections shall be flagged when required as shown on plans. <br />If work is done at night or encroaches on the hours of darkness all road work ahead signs shall have a flashing beacon, light towers will <br />be used for flaggers and work areas and all other latest CA MUTCD 2014 Edition, Temporary Traffic Control requirements shall be met <br />or exceeded as well. <br />NOT TO SCALE—SPACING OF SIGNS, TAPER AND TANGENTS WILL BE SPACED AS PER TABLE HAS SET FORTH AS GOVERNED BY <br />TRAVEL SPEEDS. <br />All traffic devices shall meet or exceed latest CA MUTCD 2014 Edition, Temporary Traffic Control. All signs shall be high intensity night <br />time reflective, 48"x48" roll up signs. All signs shall have a minimum of 2, 18" day time flags attached to sign stands during day time <br />hours and if applicable flashing 12", 12v beacons for night time work. <br />Sign stands shall meet latest CA MUTCD 2014 Edition, Temporary Traffic Control, as well as allowing for 18" to 7' height for signs and <br />spring equipped for windy conditions. <br />All hours of work shall be dictated by the City specified lane closure charts or as directed by the City Inspector. <br />Vehicle path of travel shall never be less than 12' in width. Closures and excavation not to exceed what forces expect to excavate per <br />the daily shift. <br />Roadway shall not be opened until safe for public use. All open trenches must be plated or backfilled prior to public usage. <br />All areas of excavation must have a valid USA dig tag with corresponding dig ticket number. Proof must be carried with the excavating forces <br />at all times.
The URL can be used to link to this page
Your browser does not support the video tag.