Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T-1 regular <br />T-2 Plus <br />T-3 Premium <br />T-4 Diesel <br />Are both vent and tank riser piping <br />❑✓ Yes <br />[Z]Yes <br />❑✓ Yes <br />❑✓ Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Model <br />Emco A1100EVR <br />Emco A1100EVR <br />Emco A1100EVR <br />Emco A1100EVR <br />What is the OPE response when activated? <br />Shut off <br />Shut off <br />F,/] Shut off <br />❑✓ Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />❑Restricts <br />❑Restricts <br />❑Restricts <br />❑Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />❑✓ No <br />❑✓ No <br />❑✓ No <br />❑✓ No <br />At what level in the tank is the OPE set to <br />85 1/2" <br />85 3/4" <br />85" <br />85 1/4" <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />94% <br />94% <br />94% <br />94%which <br />the OPE activates? <br />Is the OPE in proper operating condition to <br />❑✓ Yes <br />❑✓ Yes <br />❑✓ Yes <br />❑✓ Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />❑✓ Pass✓❑ <br />Pass <br />❑✓ Pass <br />✓❑ Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />