My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 9:57:45 AM
Creation date
6/7/2021 8:08:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Spill Container Testing Report Form <br />[6.SPILL CONTAINER DETAILS <br />Test Method Developed by [J Manufacturer /Industry Standard [J Professional Engineer <br />Test Type Pressure Vacuum (7]Hydrostatic <br />Tank ID 87 Main Fill 87 Siphon Fill 91 Fill <br />Spill Container Manufacturer:ow OPW ow <br />..Nonmetallic NonmetaIlic 7Nonmetallic ElNonmetallice0oaoic0ec <br />DOther Dther ThOther DOther <br />Is the spill container minimum Yes Yes Yes DYes <br />hser volume? <br />excluding DNO*DN0*DN0*DN0* <br />Drain Drain Drain EDrainMethodtokeepspillcontainerPumpPumpEPumpPump <br />Other Other Other Other <br />.{jPass 7jPass Pass JPasspionameresesuEFailEFailLiFailEFail <br />Tank ID 87 Main Vapor 87 Siph.Vapor 91 Vapor <br />Spill Container Manufacturer:ow ow ow <br />.f7jNonmetallic RiNonmetallic LjNonmetallic LjNonmetallicet0oatoicrotect <br />ZOther LiOther DOther flOther <br />Is the spill container minimum Yes jYes Yes ElyescapacityfivegallonsexcludingNI* *K *M * <br />riser volume?‘.0 ‘.0 “.0 “.0 <br />.JDrain EDrain HDrain LiDrainMethodtokeepspillcontainerPumpEPumpPumpJump <br />Other DOther DOther ther <br />.Pass [ZiPass Pass EPassSpillContainerTestResults <br />UFail flFail ZFaiI EEFaiI <br />8.COMMENTS <br />Describe all answers marked “Other,”“No,”or “Fail”and each proposed remedy <br />*Mark here if: <br />Spill containers do not have a minimum capacity of five gallons and require replacement. <br />Additional copies of this page may be attached. <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.