My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:27:43 AM
Creation date
6/8/2021 9:27:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e 0 <br />71 S6 Overfill Valve in Tank Shut off Level Worksheet <br />important This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority.Having,Jtirisdic-. <br />Con (AHJ) and review local, state, and national'codes to determine the regulatory requirements governing <br />shut-off ,capocitY in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the followirig measurements`with the valve in- <br />stalled in the tank: <br />—-`� <br />Distance from the �1 50 inlet tube flange to the cast <br />i <br />lug in the 71 SO booty (see figures), upper tube length. <br />i <br />Note. the Upper Tube Length must be at least 16" to in- <br />clude the protective bend in the tube. <br />r <br />(D) _ �1 <br />Distance from the 71 SO inlet tube flange to the top and <br />I <br />bottom of lower tube, valve length. <br />(D) <br />(W) = /� Y ?� <br />Upper <br />(U) = L�2 %:u. <br />Tube <br />Distance from the 71 SO inlet tube flange to the bottom <br />of the tank. Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />' <br />(OPW 6111 & 61TPlnodels add 0.6") <br />From the tank calibration chart provided by tank manu- <br />facturer find the dipstick number (Y) which corresponds <br />to the 100% volume, <br />(B) <br />To Tank <br />1. To determine shut-off percentage: <br />Subtract upper tube length (D) from distance to tank <br />(U) Valve <br />bottom (B) <br />(}(} _ (i3) - (®) - 2" = l� 1fy .�� �Z %0 y/.[ <br />Length, <br />top of cut <br />using the tank calibration chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X) dimension and the 100% volume (Y) tank <br />capacity. <br />(X) tank capacity In gallons = <br />(Y) tank capacity in gallons = <br />500/0 _ (}{) capacity / (Y) capacity X100=14 <br />/I I W5 Kroo = 9Y- I -If <br />t L(q W <br />(W) Valve <br />Length, <br />bottom of <br />cut <br />f� <br />(Y) <br />Tank <br />Chart <br />100% <br />Volume <br />Dipstick <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes, If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced, For <br />reference 40 CFR part 280 Subpart B Section 280,20 overfill <br />valves should be set to a maximum of 95%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.