Laserfiche WebLink
i <br /> w w 0 <br /> A <br /> P. O . Box 1596 Patterson , CA 95363 - 1596 Phone (209) 8924470 a Fax (209) 8924469 <br /> 1 <br /> VIA EMAIL <br /> June 4, 2021 <br /> San Joaquin County Community Development Department <br /> Attn : Kelsey Gunter <br /> 1. 810 East Hazelton Avenue <br /> Stockton , CA 95205 <br /> Re : Application No . PA- 21, 00073 ( LA ) - Amajit & Pulvy Sandhu APN 253 - 290 - 09 & 10 <br /> Dear Ms . Gunter : <br /> These comments are submitted on behalf of the Del Puerto Water District ( " District " ) . <br /> The above referenced parcels are located within District boundaries , and the District <br /> provides agricultural water service to Parcel 253 " 290 - 09 on 79 irrigable acres . APN 253 <br /> 2940 is not served due to its size . The District delivers water supplies to eligible lands <br /> within its boundaries through canalside turnouts located on the Delta - Mendota Canal <br /> that are licensed for this purpose . The Turnout designed to serve the existing parcel ( s ) is <br /> located at Delta � Mendota Canal Milepost 21 . 1. 2R . The District does not own , operate or <br /> maintain any distribution systems for delivery of available water supplies beyond its <br /> canalside points of delivery , Landowners involved in parcel splits or subdivisions are <br /> advised that easements and / or shared delivery system agreements required to provide <br /> access across intervening property ( ies ) to the existing point of delivery must be in place <br /> at the time of the proposed action in order to ensure continuing access to District <br /> allocated water supplies . <br /> One other noteworthy item with regard to this application has to do with the District ' s <br /> contractual requirement to separately meter water deliveries to all its water users . <br /> Insofar as the granting of this application would result in the creation of three saleable <br /> parcels , each potentially in need of water service from the District, the Board of Directors <br /> has determined and the applicant should be advised that any and all additional metering <br /> sites required as a result of this and any future parcel splits are to be designed , equipped , <br /> installed and maintained in accordance with District requirements at individual <br /> landowner expense . <br />