Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN -PAGE 1 (One farm per facility) <br /> TYPE.OF ACTION Q -NEW PLkN 2,CHANGE OF INFORMATION Rut. <br /> I. FACILUY INFORMATION <br /> FACILITY ID# (ARenc) tl Onlvl <br /> BUS SNA: t me a5 FAC=NAME)" R01 <br /> iC <br /> B S . S ITE t Rat. C gnu. <br /> = H. S ILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from EiST systems and supplements the emergency response plans and proccdure5 in the facility's Hazardous Material., <br /> Business Plan. <br /> V If Cafe to do so,facility nnel will take unmediate meuxures to control or stop arty release(e.g.,activate pump shut-off,M.)and,if necessary,safely remove <br /> remaining hazardous material from tae UST system. <br /> 'r Any release to lecondar5 containmeat will be pumped or otherwise removed within a time consistent with the ability of the secondary containment syste.n to <br /> contain the hazardous ma; rial,but not greater than 30 calendar days,or sooner if required by the local agencl. Recovered hazardous materials,unless still suitable <br /> for their intended use,wil be managed as hazardous waste. <br /> > Absorbent material will used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no 1 ager intended for use will be managed.as hazardous waste unless a waste determination in accordance with 22 CCR W262.I i finds that <br /> it is non-hazardous. Ust d absorbent material. reusable or waste.will he stored in a properly labeled and sealed,container Waste material shall be disposed <br /> appropriately. <br /> > Facility personnel will d ervidne whether any water remover)from secondary containment systems, or frons clean-up activity,hus been in contact with any <br /> hdz embus ttiaterlal.if the water is contaminated,it will be managed as hazardous waste unless it waste determination in accordance with 22 CCR W262J I fends <br /> thus it is non-hazardous- f the water has u petroleum sheen(i.e.,ruinboW colors),it is cantaininated. A thick flouting petroleum layer awy not necessarily display <br /> rainbow colors. %Pater(h us or non-hazardouR)from sumps,spill containers,etc,will nor be disposed to storm water systems. <br /> > We will review.wcondary containwem systems for possible deterioration if any of the following conditions occur' <br /> I- Hazardous material irl contact with secondary containment is nor compatible with the material used for secondary containment: <br /> 2. Secondary containment is prone to dunnage from any equipincnt used to remove or cleanup hu2andou4 material collected in secondary conwinmef,t; <br /> 3. Hazarduus material, 3her than the pruduct/w•,tste stored in the primary containment system,is placed inside secondary containment to treat ur neurralize <br /> released pruductlwas ;and the added material ear resulting material from such a combination is not compatible with secondary containment. <br /> 11I. SMI, CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAiNTENANC'F: Spill control and ctcan-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan, This <br /> equipment is iltVected at Icas monthly,and:after each uso.cupplics are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERI[ '*)EPTLY ON-5TTE BL11 AVAILABLE FOR USE IF NEEDED: (Gout fete ly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RJO R?n, R3r1. <br /> R]1, R21. R31. <br /> Ft i_ R21, R32. <br /> R 13. R2'f. R33. <br /> R l4. R14. - R'14 <br /> R15 RS R35 <br /> IV. RESPONSIBLE PERSONS = <br /> THE F0401YING PERS NLS)ISIARE RESPONSIBLE FOR AUTHORIZIING,-kM1Y WORK NECESSARY UNDER THIS RESPONSE PLAN- <br /> NA <br /> NILE <br /> LAY:NAME A R40 TITLE RSU. <br /> F <br /> NAME Rat TTTLE tut. <br /> NAIVE R42 TITLE R52. <br /> NAME ka.e. TITLE R53. <br /> V. MONITORING MICATORS <br /> IF MONrrORING INDICATI S A POSSIBLE UNAUTHORIZED RELEASE-STEPS TO VFRIF V THE RELEASE WILL HE iV1ADE AS FOLLOiWS: <br /> ❑ .Additional system TCstina data collection ❑Inspection by qualified persons ❑Recalibratinn of equipment <br /> Other. <br /> RStl. <br /> UST Response Plan(12!7010)-113 <br />