Laserfiche WebLink
4. The section discussing Leachate Control Measures has been <br />revised to include funds for any closure costs which may <br />occur. Part (6) -COST, under Leachate Control Measures, has <br />been revised to read: Although the leachate collection and <br />removal system will be installed before closure, additional <br />work may be required, such as installation of additional <br />collection sumps. A sum of $5000 was allocated to cover these <br />costs. <br />In the telephone conversation, you were concerned about the cost <br />estimate for installing gas wells at the site. The County hired <br />EMCON Associates to install a gas monitoring system at the Harney <br />Lane Sanitary Landfill. EMCON is charging $11,600 to install and <br />twice monitor 12 gas wells. This rate works out to approximately <br />$1,000 per well as reported in the Preliminary Closure Plan. <br />EMCON's proposal is enclosed (Attachment 2). <br />The Estimated Closure Cost Summary on page 30 of the Closure Plan <br />has been revised to reflect all of the changes above. Please <br />replace the old pages 24-30 of the Preliminary Closure and <br />Postclosure Plan with the enclosed pages. If you have any <br />questions, please call Gabe Karam or Wes Johnson at (209) 468-3066. <br />Sincerely, <br />TOM HORTON <br />Solid Waste Manager <br />enclosures <br />c: Ed Padilla, Public Health Services <br />TH: WJ: wj <br />R:\RUDY\EN\NC\GAUFFLET <br />LA 63400 <br />