Laserfiche WebLink
The North County Sanitary Landfill Access Road Development and <br />Modules 1 & 2 Preparation has been completed, and Modules 1 & 2 <br />are ready to accept waste. However, the recycling center will not <br />be completed until approximately February of 1992. The following <br />presents the operational plan for the North County Sanitary <br />Landfill for approximately the next six months. <br />The first lift will be approximately three feet thick and will <br />consist of selected waste from San Joaquin County landfills and <br />transfer stations. This selected waste will be pre-sorted to <br />remove sharp objects which could have the potential to damage the <br />liner. The first lift will cover the entire module and will be in <br />place before the rainy season begins. <br />A second lift of 8 feet will be placed in the southeast 1/4 of the <br />module. The lift will be covered and chip sealed to provide a pad <br />for winter operations. Waste can be pushed off the pad onto the <br />lower lift throughout the winter of 1991-92. <br />Operations will continue as described above until the Recycling <br />Center is completed. <br />