Laserfiche WebLink
Ed Padilla <br />September 27, 1991 <br />Page 3 <br />IV. BORROW STOCKPILE <br />It is estimated that approximately 29,000 cubic yards of cover <br />material will be needed during winter operations for the five month <br />period spanning November to March. Daily cover needed for <br />operations during these months will come from the excavation of <br />the next module located south of Module 1. This excavation has <br />already begun and daily cover for the winter fill area will be <br />taken as needed. <br />ki-i+I4iY,KAID <br />The Winterization Plan is designed to provide for five months of <br />seasonal operations through the winter beginning November, 1991, <br />and ending in March of 1992. In addition, adequate drainage, refuse <br />space, and cover material are provided to ensure limited <br />maintenance and normal operation of the landfill. <br />GK: AC: vj <br />Rt\VIRGINIA\NCWINPLN.EP <br />Attachment <br />LA 63215 <br />