Laserfiche WebLink
Workplan for Additional Pilot Study May 25, 2018 <br />Injection Testing <br />LIST OF FIGURES <br />Figure 1 Site Location Map <br />Figure 2 Site Plan <br />Figure 3 Detailed Site Plan with Injection Borings <br />Figure 4 Detailed Distribution of Hexavalent Chromium — March 7 and 8, 2018 <br />LIST OF TABLES <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br />Summary of Groundwater Elevation Data <br />Summary of Groundwater Analytical Results <br />Summary of Groundwater Analytical Results — Total Recoverable Metals <br />Summary of Groundwater Analytical Results — Dissolved Metals <br />Summary of Groundwater Analytical Results — Additional Analytes